Study of Air Dispersion Modeling to Determine Appropriate Air Quality Monitoring Stations, i.e., one downwind and one upwind

The main objective of this study was to identify the appropriate locations for ambient air quality monitoring stations around the Duqm power stations at downwind and upwind locations. The purpose was to find a location with the highest ground-level concentrations (GLCs) resulting from Duqm Power Station (P/S) operations and to assess the environmental compliance with

Category : Design and Modelling, Environmental Services

Gap Analysis and development of Environment Management System (EMS 14001: 2018) for a Confidential Client in Oman

ADP Consultants in 2019-2020 conducted Gap Analysis/ Environmental Compliance Audits for a confidential client’s entire power generation facilities in the Sultanate of Oman. The Environmental Audits highlighted the areas of improvement in Client’s commitment to environmental management and performance. Subsequently, ADP provided consulting services to the client in 2020 by developing a comprehensive EMS based on

Category : Environmental Services

Environment and Social Impact Assessment (ESIA) for the Submarine Cable System landing in Aqaba, Jordan.

ADP Consultants in 2023 conducted ESIA for a proposed Submarine Cable System landing in Aqaba, Jordan. The objective of the study was to obtain ESIA approval from Aqaba Special Economic Zone Authority (ASEZA) Jordan. The ESIA study identified and assessed all the significant impacts of the project activities on the marine and onshore environment. ADP

Category : Environmental Services